Home   /   Viking Energy Archive   /   Sandwater Road planning application

Sandwater Road planning application

Sandwater Road Volume 1 - Non-Technical Summary

Non-Technical Summary

Sandwater Road Volume 2 - Written Statement

Written Statement - Front Cover and Contents

Chapter 1: Introduction and Background

Chapter 2: EIA Process

Chapter 3: Consideration of Alternatives

Chapter 4: Description of Proposed Development

Chapter 5: Planning

Chapter 6: EIA Scope and Pre Application Consultation

Chapter 7: Landscape and Visual

Chapter 8: Ornithology

Chapter 9:Ecology

Chapter 10: Hydrology, Hydrogeology and Geology

Chapter 11: Cultural Heritage

Chapter 12: Other Issues

Sandwater Road Volume 3 - Figures

Figures: Cover and Contents

Figure 1.1 - Location Plan

Figure 3.1 - Comparison Showing 2016 and 2019 Alignments

Figure 4.1 - Proposed Development

Figure 7.1 - Landscape Character

Figure 7.2 - Visual Receptors

Figure 9.1 - Ecological Designated Sites

Figure 11.1 - Heritage Assets in the Inner Study Area

Figure 11.2 - Heritage Assets in the Outer Study Area

Sandwater Road Volume 4 - Technical Appendices

Technical Appendices Cover and Contents

Appendix 1.1 - Screening Opinion

Appendix 4.1 - Schedule of Mitigation

Appendix 4.2 - Outline Draft CEMP

Appendix 4.3 - Typical Cross Sections

Appendix 4.4 - Proposed Bridge

Appendix 4.5 - Earthworks Cut and Fill

Appendix 6.1 - Pre-Application Briefing Note

Appendix 6.2 - Minutes of Telecom Meeting

Appendix 8.1 - 2016 ES Ornithology Chapter

Appendix 8.2 - 2016 ES Baseline Bird Surveys Technical Report

Appendix 8.3 - 2018 Bird Survey Update

Appendix 8.4 - Draft Bird Protection Plan

Appendix 9.1 - 2016 ES Ecology Chapter

Appendix 9.2 - 2016 ES Ecology Figures

Appendix 10.1 - Water Crossing Schedule from 2016 ES

Appendix 10.2 - Catchment Descriptors from 2016 ES

Appendix 10.3 - Peat Landslide Hazard Risk Assessment from 2016 ES

Appendix 10.4 - Peat Management Plan

Appendix 10.5 - Figures 10.1 to 10.6 from 2016 ES

Appendix 11.1 - Gazetteer of Heritage Assets within the Inner Study Area

Appendix 11.2 - Re-Categorised Features of No Heritage Significance

Appendix 11.3 - Cultural Heritage Management Plan

Appendix 12.1 - Air Quality Construction Mitigation

Appendix 12.2 - Construction Noise Calculations

Appendix 12.3 - Basic Noise Levels

 

« Back to Document Archive

Viking Energy Updates

Subscribe Close this box