Sandwater Road planning application
Sandwater Road Volume 1 - Non-Technical Summary
Sandwater Road Volume 2 - Written Statement
Written Statement - Front Cover and Contents
Chapter 1: Introduction and Background
Chapter 3: Consideration of Alternatives
Chapter 4: Description of Proposed Development
Chapter 6: EIA Scope and Pre Application Consultation
Chapter 7: Landscape and Visual
Chapter 10: Hydrology, Hydrogeology and Geology
Sandwater Road Volume 3 - Figures
Figure 3.1 - Comparison Showing 2016 and 2019 Alignments
Figure 4.1 - Proposed Development
Figure 7.1 - Landscape Character
Figure 9.1 - Ecological Designated Sites
Figure 11.1 - Heritage Assets in the Inner Study Area
Figure 11.2 - Heritage Assets in the Outer Study Area
Sandwater Road Volume 4 - Technical Appendices
Technical Appendices Cover and Contents
Appendix 1.1 - Screening Opinion
Appendix 4.1 - Schedule of Mitigation
Appendix 4.2 - Outline Draft CEMP
Appendix 4.3 - Typical Cross Sections
Appendix 4.4 - Proposed Bridge
Appendix 4.5 - Earthworks Cut and Fill
Appendix 6.1 - Pre-Application Briefing Note
Appendix 6.2 - Minutes of Telecom Meeting
Appendix 8.1 - 2016 ES Ornithology Chapter
Appendix 8.2 - 2016 ES Baseline Bird Surveys Technical Report
Appendix 8.3 - 2018 Bird Survey Update
Appendix 8.4 - Draft Bird Protection Plan
Appendix 9.1 - 2016 ES Ecology Chapter
Appendix 9.2 - 2016 ES Ecology Figures
Appendix 10.1 - Water Crossing Schedule from 2016 ES
Appendix 10.2 - Catchment Descriptors from 2016 ES
Appendix 10.3 - Peat Landslide Hazard Risk Assessment from 2016 ES
Appendix 10.4 - Peat Management Plan
Appendix 10.5 - Figures 10.1 to 10.6 from 2016 ES
Appendix 11.1 - Gazetteer of Heritage Assets within the Inner Study Area
Appendix 11.2 - Re-Categorised Features of No Heritage Significance
Appendix 11.3 - Cultural Heritage Management Plan
Appendix 12.1 - Air Quality Construction Mitigation
Appendix 12.2 - Construction Noise Calculations
Appendix 12.3 - Basic Noise Levels
« Back to Document Archive